• New design use cold water to spray and cool down bottle cooling tunnel
  • New design use cold water to spray and cool down bottle cooling tunnel
  • New design use cold water to spray and cool down bottle cooling tunnel
  • New design use cold water to spray and cool down bottle cooling tunnel
  • New design use cold water to spray and cool down bottle cooling tunnel
  • New design use cold water to spray and cool down bottle cooling tunnel

New design use cold water to spray and cool down bottle cooling tunnel

After-sales Service: One year
Warranty: One year
Process: Thermal Processing
Power Source: Electric
Certification: CE, ISO9001
Automatic Grade: Automatic
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Company Profile
  • Our Service
  • Trade shows
  • Certificate
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
PLL-6000
Application
Milk, Yogurt, Fruit Juice
Customized
Customized
Material
SUS304/316L
Control Type
Semi-Automatic or Full Automatic
Condition
New
Voltage
380V
Power(W)
8kw
Weight
1250kg
Dimension(L*W*H)
10000*2000*1800mm
Energy Consumption
Low Consumption
Effeciency
High Effeciency
Tunnel area
13.5 squre meters
Total power
9.6kw
Transport Package
Wood Package and Framework
Specification
ISO9001: 2008/HACCP/GMP
Trademark
Beyond
Origin
China
HS Code
8438200000
Production Capacity
100 Sets Per Year

Product Description

New design use cold water to spray and cool down bottle cooling tunnel
New design use cold water to spray and cool down bottle cooling tunnel
Tunnel spraying cooler adopts recycling warm water to perform pre-cooling and use spraying cold water to cool down, which takes 3 procedures; the temperature and holding time can be regulated and auto controlled; This type cooler is widely used to cool the bottle, can packed type acidic milk, juice, beverage, beer, and flavor etc.

Technical

 

Model

PLL-6000

PLL-10000

PLL-12000

PLL-15000

PLL-18000

Line speed of the conveyer

110-553mm/min

Cold water consumption (m3)

21

40

55

80

120

Total power (kw)

9.6

10.6

13.6

16.5

25

External dimension(mm)

Length  

6500

12000

14500

16880

19880

Width 

2250

Height 

1735

Weight(kg)

3000

5000

6500

8500

12000

Tunnel area(m2)

13.5

22

26

32

38.5

 


New design use cold water to spray and cool down bottle cooling tunnel
 
Company Profile

New design use cold water to spray and cool down bottle cooling tunnel

New design use cold water to spray and cool down bottle cooling tunnel
New design use cold water to spray and cool down bottle cooling tunnel
Our Service
New design use cold water to spray and cool down bottle cooling tunnel

 

Trade shows

 


New design use cold water to spray and cool down bottle cooling tunnel
Certificate

 

New design use cold water to spray and cool down bottle cooling tunnel


 

Packaging & Shipping


New design use cold water to spray and cool down bottle cooling tunnel
 

 

FAQ

 

1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.

 

2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.

 

3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .

 

4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .

 

5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.

 

6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.

 

7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.

 

8) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.


 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now