Customization: | Available |
---|---|
After-sales Service: | One year |
Warranty: | One year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model |
LG-UHT-1 |
LG-UHT-2 |
LG-UHT-3 |
LG-UHT-4 |
LG-UHT-5 |
Production capacity |
1000 | 2000 | 3000 | 4000 | 5000 |
Inlet temperature |
5ºC | 5ºC | 5ºC | 5ºC | 5ºC |
Holding time(s) |
4-15 | 4-15 | 4-15 | 4-15 | 4-15 |
Sterilize temperature |
105~143ºC | 105~143ºC | 105~143ºC | 105~143ºC | 105~143ºC |
Product outlet temperature |
20 | 20 | 20 | 20 | 20 |
Ice water inlet temperature |
≤2ºC | ≤2ºC | ≤2ºC | ≤2ºC | ≤2ºC |
Steam pressure |
0.5MPa | 0.5MPa | 0.5MPa | 0.5 MPa | 0.5 MPa |
Steam consumption |
~150Kg/h | ~210Kg/h | ~280Kg/H | ~350Kg/h | ~420Kg/h |
Compressed air pressure |
0.6MPa | 0.6MPa | 0.6MPa | 0.6MPa | 0.6MPa |
Compressed air consumption |
50L/H | 50L/H | 60L/H | 60L/H | 70 L/H |
External dimension(mm) (homogenizer excluded) |
3500×2000×2500 | 3500×2000×2500 | 4500×2500×2200 | 5000×2000×2200 | 5000×2000×2200 |
Total weight of machine |
1700kg | 2000Kg | 2200 Kg | 2500Kg | 2800kg |
1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.
2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.
3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .
4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .
5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.
6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.
7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.
8) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.