Cheese processing plant mozzarella cheese making machine small scale cheese making equipment
Factory layout plays a crucial role in production planning and factory operation. The correct planning of dairy plants (or other food plants) not only improves production efficiency, but also improves quality. Considering that quality is a necessary condition for any food production factory, it is very important to ensure that failures and equipment can maximize the selected quality. The structural design of the factory should consider quality, function and safety. Food safety is the cornerstone to ensure food quality.
It is important for cheese processing plants to maintain high standards of safety. Ignoring the quality of the production line will endanger the lives of many people. This requires the removal of exposed products from these processing lines. The layout of the food factory plays a key role in ensuring the quality, because it will not only damage the smoothness of the products, but also lead to cross contamination of the products in the processing line.
Plate pasteurizer(3 sections)
Technical parametre: 5
ºC→65
ºC(homogenization)
→85~95
ºC(15S)
→5
ºC
This unit can be connect with separator, homogenizer, flash evaporator & degasser ect. this unit is used as Pasteurizer (widely used in fresh milk, milk beverage, juice, tea, alcohol, ice cream ect.) ,and also pre-sterilize material when producing Pasteurized milk(long life milk).
This machine has features of high heat recovery, lower energy cost, strict design on the construction and easy operation, simple maintenance.
Control type:
Full-automatic control
(PLC with touch screen),
Semi automatic PID Control.
Standard attachments:
A. Plate heat exchanger;
B. Material-balance bucket;
C. Hot water-balance drum;
D. Hot water pump;
E. Product pump;
F. Steam & water mixer;
G. Electricity box;
H. Stainless steel pipes and valves etc.
I. PLC and color touch screen;
Production capacity: 500L-20T/H
Condition: New
Brand name: Shanghai Beyond;
Type: whole processing Line/turnkey project/fruit and vegetables processing/dairy processing/beverage processing
Voltage: 220v/380v
Power(W): 100-200kw
Weight: Different size different weight/customized
Dimension(L*W*H): Different size different dimension/customized
Certification: CE&ISO
Warranty: 12 months/1 year
After-sales Service Provided: Engineers available to service machinery overseas
Main material: SUS304 or SUS316
Control type: automatic, semi-automatic
energy consumption: Low consumption with high efficiency
capacity: 500-10000L/H-customized
installation period: 1-3months
Period time: 30 days-120 days
Cups material: pouches, paper box, glass bottle, pet bottle, glass bottle
Product storage condition: room temperature; low temperature;
Quality Factors of Cheese Processing Factory
The quality and covering ability of cheese largely depend on the environment of cheese production. These are abandoned milk processing centers, which may be appropriate, usually located in remote dairy areas. The second component of the rural cheese production building is the mature cellar and factory layout. In order to meet or approach these standards, it is recommended that the floor of the room where the facility is located below the ground should be excavated about 1.5 meters below the ground, and windows or openings should be opened on the upper wall to reduce the temperature of the basement, which is particularly important at night. The size of the building depends on the amount of milk received during peak production. A small device can process an average of 100 to 50 litres of milk per day. For the layout of cheese processing plants in these quantities, the living area should be about 50 square meters meters. Micks and Chess products improve the production efficiency of dairy products, dairy products or cheese by providing our main planning services. We analyzed various options for expanding, rebuilding or creating new faults, using our proprietary products to create your diary and cheese production as well as wort. A deep understanding of hygiene design principles enables our architects and engineers to work hard to prevent many problems that lead to chronic food safety problems.
Customization of cheese processing factory
Use our engineering assembly methods to create your own dairy. Our project research method provides you with a choice of finished product quality and cost. The scope of construction services ranges from selecting your preferred contractor to formulating a single contract between us and the subsidiary
Layout of processing plant. It is a unique requirement for dairy industry to design and produce dairy products, cheese and dairy products enterprises with professional knowledge. The sanitation and hygiene requirements of these plants usually include both internal and external. Most piping, pumps, valves and equipment shall be capable of CIP. It must also be based on demanding health conditions. Dry cheese and the acid by-products of cheese factories corrode food, pipes, floors and drainage systems. In key rooms, highly filtered air is required to control bacteriophages.
Vacuum production of cheese or yogurt requires the addition of acidophilic bacteria in milk, because heat release will destroy many lactic acid bacteria. Maturity: This stage of cheese products makes the texture of cheese even and tastes delicious.
Stirring In the layout of this cheese processing plant, cream is stirred until a premium product is obtained, which is then put into a new tank for saccharification and emulsification. Skimmed cheese is melted and emulsified with salt to achieve solid consistency, and then cooled to form processed cheese.
Company Profile
Our Service
Trade shows
Certificate
FAQ
1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.
2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.
3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .
4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .
5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.
6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.
7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.
8) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.