• UHT milk processing line UHT milk production equipment
  • UHT milk processing line UHT milk production equipment
  • UHT milk processing line UHT milk production equipment
  • UHT milk processing line UHT milk production equipment
  • UHT milk processing line UHT milk production equipment
  • UHT milk processing line UHT milk production equipment

UHT milk processing line UHT milk production equipment

After-sales Service: One year
Warranty: One year
Process: sterilizing
Power Source: Electric
Certification: CE, ISO9001
Automatic Grade: Automatic
Customization:
Diamond Member Since 2012

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
  • Overview
  • Company Profile
  • Our Service
  • Trade shows
  • Certificate
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
BEYOND
Application
Milk, Yogurt, Milk Powder, Cheese
Customized
Customized
Name
Milk processing line
Material
SUS304
Raw material
Fresh milk or milk powder
End product
UHT milk or pasteurized milk
Package type
Plastic bag, plastic bottle
Transport Package
Standard Package for Exported Goods
Specification
Different model
Trademark
Beyond
Origin
Shanghai China
Production Capacity
50 Sets Per Month

Product Description

UHT milk processing line UHT milk production equipment

UHT milk processing line UHT milk production equipment

UHT (Ultra High Temperature) milk processing line is an automated production line used for producing ultra-high temperature sterilized milk. This process ensures that milk is processed and packaged under sterile conditions, prolonging the shelf life of the product, which typically allows milk to be stored at room temperature for several months without spoilage.

The following is the basic process and components of UHT milk processing line:

Pre processing: • Receiving and storage: Raw milk is first received and stored in a refrigerated container, kept at a low temperature to prevent bacterial growth Filtering: Remove impurities such as hair and soil from milk through a filter.
• Standardization: An optional step to adjust the fat content of milk to specific standards, such as whole fat, low-fat, or skim Preheating: Milk is heated to a certain temperature for subsequent sterilization treatment.
• UHT sterilization: • Ultra high temperature instantaneous sterilization: Milk is heated to at least 135 ° C to 150 ° C in a very short time (usually a few seconds), and then rapidly cooled. This rapid heating and cooling can effectively kill all harmful microorganisms while preserving the nutritional content and natural flavor of milk as much as possible Sterile environment: The entire sterilization process is carried out in a completely enclosed and sterile system, ensuring that external contamination does not affect the product.
• Sterile filling: The sterilized milk is directly fed into a sterile filling machine and filled into pre sterilized packaging containers in a sterile environment, such as paper boxes, plastic bottles, or composite film packaging bags Sealing and cooling: The container is immediately sealed to maintain a sterile state, and then the temperature is lowered through a cooling system to prepare for market circulation.
Quality control and inspection: Throughout the entire process, there are multiple quality monitoring points, including raw milk testing, sterilization effect monitoring, and finished product testing, to ensure the safety and quality of the final product.
• Packaging and palletizing: • The packaged UHT milk is packaged on an automatic packaging line, then palletized and ready for shipment to retailers or distribution centers.

The UHT milk processing line adopts highly automated technology to reduce manual intervention, improve production efficiency and safety. This technology is not only applicable to milk, but also widely used in the processing of other liquid foods such as fruit juice and soy milk.
 

UHT milk processing line UHT milk production equipment

Condition: New

Brand name: Shanghai Beyond;
Type: whole processing Line/turnkey project/fruit and vegetables processing/dairy processing/beverage processing
Voltage: 220v/380v
Power(W): 100-200kw
Weight: Different size different weight/customized
Dimension(L*W*H): Different size different dimension/customized
Certification: CE&ISO
Warranty: 12 months/1 year
After-sales Service Provided: Engineers available to service machinery overseas
Main material: SUS304 or SUS316
Control type: automatic, semi-automatic
energy consumption: Low consumption with high efficiency
capacity: 500-10000L/H-customized
installation period: 1-3months

Period time: 30 days-120 days
Cups material: pouches, paper box, glass bottle, pet bottle, glass bottle

Product storage condition: room temperature; low temperature;

 UHT milk processing line UHT milk production equipment

The other is pasteurized milk. In order to maintain the nutrition of milk as much as possible, some milk is processed by pasteurization technology: the milk is heated to 62-65 ° C for 30 minutes. Through this technology, 97.3% ~ 99.9% of bacteria in milk can be eliminated. There are also some thermophilic bacteria, thermophilic bacteria and spores, but they are the most beneficial lactic acid bacteria. In addition, pasteurized milk has high requirements for milk source.



Milk collection and storage

Refrigerated milk storage tanks are used for milk collection, cooling and storage in milk collection centers, pastures, dairy plants, food factories and dairy farmers. Refrigerated milk storage tank is an important supporting equipment for mechanized milking ranch and artificial milking ranch. In addition, it can cool and store other liquid materials to prevent bacterial propagation.

Related machinery of dairy(cheese, butter, milk, yoghurt,cream) processing line

Large outdoor storage tank, agitator tank, jacket tank, ferment growing tank, emulsification tank, milk weighing, milk receiving/collecting, extracting, pasteurizer yoghurt, UHT, HTST pasteurizer, plate pasteurizer, tubular UHT sterilizer, spraying type pasteurization, cooling tunnel, bottle tilting sterilization chain, CIP cleaning system, full-auto CIP, semi-auto CIP, evaporator, curd cutting, whey draining, cheese making, scalding/stretching/molding, cheese vat, mozzarella cheese, cheddar cheese, blending system, pre-pasteurization, cream separator system, powder melting, dissolving system, homogenizer system, turn-key project.

 

 

FLOW NO. NAME SIZE MAIN TECHNOLOGY PARAMETER
A     milk reception unit
A-1
loadometer
 
maximum weighing 30T
A-2
distribution plate
 
material-touch SUS304 stainless steel,six holes
A-3
electron pound scale             
maximum weighing 1000KG
A-4 milk weighing tank 500L material-touch SUS304 stainless steel,single layer,product feeded in through 40 mesh filter net,CIP cleaning ball
A-5 milk acceptor        1000L material-touch SUS304 stainless steel,single layer,CIP cleaning ball
A-6 milk pump 10T/h material-touch SUS304 stainless steel,pump lift is 24 meters,machinical sealing,inner polished
A-7 twin piping filter 10T/h SUS304 stainless steel,two pipe,Stainless Steel Filter Element 100 Mesh
A-8 plate cooler 10T/h material-touch SUS304 stainless steel,one section,temperature change=16ºC,outlet milk temperature is 4ºC
A-9 storage tank 10000L material is SUS304,insulation,with decentration agitator,dimple pad, conical head,sealed manhole,breather vent,digital show thermometer,plate anti vortex,adjustable legs
A-10
milk pump
5T/h material-touch SUS304 stainless steel,pump lift is 24 meters,machinical sealing,inner polished
B     raw milk pre-pasteurization unit
B-1 plate-Pasterlizer  5T/h SUS304 stainless steel,plate type,85ºC-95ºC,15S,full-auto control,high temperature discharging, low temperature backflow,with temperature recorder,CIP cleaning,Spiraxsarco steam depressure,control system
B-2 cream separator 5T/h disk separator,auto control,three-phase,started with frequency conversion,self-discharging
B-3 high pressure homogenizer 5T/h (starting box included) 
B-4 storage tank 5000L material-touch SUS304 stainless steel,insulation,with decentration agitator,dimple pad, conical head,sealed manhole,breather vent,digital show thermometer,plate anti vortex,adjustable legs
B-5
milk pump
10T/h material-touch SUS304 stainless steel,pump lift is 24 meters,machinical sealing,inner polished
C     cream storage and pasteurize unit
C-1 cream storage tank 1000L material-touch SUS304 stainless steel,heat insulated,top off- center votical agitator,conical head,airtight manhole,breather valve,digital readout thermometer,anti-eddy baffle,supporters with adjustable feet
C-2 rotary pump 0.5T/h  material-touch SUS304 stainless steel,Hard Alloy Mechanical Seal,manual stepless shift
C-3 rotary pump 2T/h material-touch SUS304 stainless steel,Hard Alloy Mechanical Seal,manual stepless shift
C-4 plate-Pasterlizer  0.5T/h material-touch SUS304 stainless steel,plate type,85ºC-95ºC,15S,full-auto control,high temperature discharging, low temperature backflow,with temperature recorder,CIP cleaning,Spiraxsarco steam depressure,control system
D     blending unit
D-1 blending tank 3000L material-touch SUS304 stainless steel,insulation,with decentration agitator,conical head,sealed manhole,breather vent,simple valve,digital show thermometer,plate anti vortex,adjustable legs
D-2 milk pump 5T/h material-touch SUS304 stainless steel,pump lift is 24 meters,machinical sealing,inner polished
D-3 plate heater union 5T/h material is SUS304,one section,heating with hot water,temperature change:50ºC,automatic temperature control
D-4 high-speed emulsification tank      1000L material-touch SUS304 stainless steel,insulation,bottom fast emulsifying head,digital show thermometer,adjustable legs
D-5 milk pump 5T/h material-touch SUS304 stainless steel,pump lift is 24 meters,machinical sealing,inner polished
D-6 double pipe filters 5T/h material-touch SUS304 stainless steel,double pipe,stainless steel filter 100 meshes
D-7 operate platform   SUS304,1200*1200*1200mm
E     yogurt sterilizing,homogenizing unit
E-1 Yogurt Pasterlizer  3T/h material-touch SUS304 stainless steel,plate type,95ºC,300S,full-auto control,high temperature discharging, low temperature backflow,with temperature recorder,CIP cleaning,Spiraxsarco steam depressure,control system
E-2 high pressure homogenizer 3T/h 25MPa,(starting box included) 
E-3 temperature holding  3T/h material-touch SUS304 stainless steel,holding 300S
F     high level storage and fermentation unit
F-1 fermentation tank  2000L material-touch SUS304 stainless steel,three layers,dimple pad jacket,insulation with PU material,central agitator with double blend speed :15 round per minute and 30 round per minute,inlet and outlet,CIP cleaning ball,breath valve,digital thermometer,air-tight manhole,sight glass,simple valve,adjustable legs
F-2 operate platform   SUS304,8000*800*1600mm
F-3 high level platform   SUS304,9000*3500*2200mm
G     yogurt and cream filling unit
G-1 plastic cup filling machine auto filling, auto sealing, each cup 200ml, speed 4000cups per hour
G-2 plastic bottle rinsing machine 2000bottle/hour, bottle volume is 1L, bottle rinsing
G-3 plastic bottle filler   2000bottle/hour, bottle volume is 1L, filling, thread capping 2 in 1
G-4 manual bottle loading platform SUS304
G-5 air conveyor   SUS304,5 meters long,include air fan
G-6 conveyer belt   SUS304,(including power head),40m
G-7 sleeve labelling machine SUS304,5000pcs/h
G-8 shrink lable machine   SUS304, steam heating,5000pcs/h
G-9 film wrapper   5000BPH
G-10 printer    
H     aseptic birck filling unit
H-1 UHT sterilizer  2T/h  tub-type,sterilzing temperature 137 ºC,holding time 4S,full automatic control
H-2 full-auto vacuum degasser 2T/h full-auto control, SUS304, differential pressure transducer imported from Germany Labom, working vacuum degree -0.64~-0.85Kpa, flow control is frequency converted type, working together with pasteurizer, with condensing device
H-3 high pressure homogenizer 2T/h 40MPa,(starting box included) ,
H-5 bricks aseptic filling machine  1000ml/bag
2000 piece per hour
H-6 cap machine    
H-7 conveyor   SUS304, 8 meters
H-8 printer    
I     Ice cream processing unit
I-1 HIGH SPEED MIXING TANK V=300L  
I-2 CENTRIFUGAL PUMP Q=3t/h SUS304,Pump Head 24M,Hard Alloy Mechanical Seal
I-3 TUB FILTER Q=3t/h SUS304,100 mesh
I-4 HIGH PRESSURE HOMOGENIZER Q=250L/h SUS304,25MPa
I-5 AGING TANK V=200L SUS304 stainless steel,heat insulated,heating or cooling jacket,top off-center vertical agitator,conical head,airtight manhole, breather valve,digital readout thermometer,supporters with adjustable feet                                     
I-6 CENTRIFUGAL PUMP Q=3t/h SUS304,Pump lift 24M,Hard Alloy Mechanical Seal,Inner Shell Bright-Polished
I-7 ICE CREAM FREEZER MACHINE Q=300L/h SUS304,
I-8 ICE CREAM FILLING MACHINE Q=300L/h SUS304
I-9  
FAST COOL ROOM
V=15M3 Cool with freon,working at -28ºC
J     full auto CIP system
J-1 full-auto CIP system 4×3T outer coat of SUS304 stainless steel material,inner shell of SUS304,three cleaning way,Concentrated acid/alcali tank adding system based on US technology,300L×2 acid/alcali Concentrate tanks
J-2 return pump 20T/h SUS304 stainless steel,pump lift 24M,Hard Alloy Mechanical Seal,Inner Shell Bright-Polished
      Part2: accessory equipments and Installation
Flow No. Name Model Main technical parameters
A     boiler system
A-1
fuel boiler host
2T/h Evaporation 2000 l/h, Italy burning machine, computer control cabinet, stainless steel multistage pumps
A-2 boiler auxiliaries   including fuel tank, refuelling plane, sampling device
A-3 boiler installation   including installation material, quick-wear parts, test fee etc
B     conpressed air system
B-1
low-pressure compressor
1.0 MPa, 5 m3 / min, with air storage tanks, chilling drying machine unit, oil removal filter
C     tower water system
C-1
cooling tower
100T/h circulation water capacity 100T/H, hot water temperature 37 ºC,  cooled wate temperature 32 ºC
C-2 tower water pool 3000L SUS304, single layer
C-3 water pump 100T/h vertical multistage pump, lift 32 meters
C-4 tower water control system cabinet material is SUS304, including the control of cooling tower, water pump 
D     ice water machine system
D-1 ice water machine unit Refrigerating capacity 300000 calories, water-cooled, full automatic control
D-2 ice water pool 10000L SUS304
D-3 water pump 100T/h vertical multistage pump, lift 32 meters
D-4 ice water control system cabinet material is SUS304, including the control of ice water system, water pump 
E     water treatment system
E-1 water treatment machine unit 10T/h including sand filter, carbon filter, ion exchange, first stage RO system, automatic control
E-2 water tank  10000L SUS304, single laye
Equipment list of milk processing equipments
       
No. Name Size Main parameter
1 Milk reception and storage unit    
2 Milk acceptor 300L SUS304 stainless steel, single layer, CIP spraying ball
3 Milk pump 3T/H SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished
4 Single piping filter 3T/H SUS304, single pipe, stainless steal filter element of 100 mesh
5 Milk storage tank 1000L SUS304, heat insulated, dimple pad jacket, vertical agitator, CIP spraying ball, breather valve, digital show thermometer, sampling point
6 Milk pump 3T/H SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished
7 Blending unit    
8 Storage tank 500L SUS304, heat insulated, dimple pad jacket, vertical agitator, CIP spraying ball, breather valve, digital show thermometer, sampling point
9 Milk pump 3T/H SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished
10 Single piping filter 3T/H SUS304, single, stainless steal filter element of 100 mesh
11 Plate-type exchanger 1.5T/H SUS304, double pipes
12 High pressure homogenizer 500L/H 40MPa
13 Cream separtor unit    
14 Milk separator 500L/H The content of dried skim milk (%)<0.03, the speed of rotator is 8000rpm
15 Buffer container 100L SUS304, with a cover, single layer
16 Buffer & cooling container 100L SUS304, with a cover, single layer
17 Milk pump 3T/H SUS304, with a cover, heat insulated, dimple pad jackets
18 Butter churner 100L SUS304
19 Yogurt storage, ferment and filling unit    
20 Temporary and ferment storage tanks 500L SUS304, heat insulated, dimple pad jacket, vertical agitator, CIP spraying ball, breather valve, digital show thermometer, sampling point
21 Milk pump 3T/H SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished
22 Rotor pump 1T/H SUS304, hard alloy mechanical seal, adjustment speed by manual
23 Plastic pouch filling machine    
24 Plastic cup-shaped filling machine    
25 CIP system unit    
26 Manual CIP system 3×500L SUS304, single clening circulation, with CIP pump of connected tanks
27 CIP return pump 10T/H SUS304, pump lift 24m ,hard alloy mechanical seal, inner shell mirror polished
28 Power system unit    
29 Cold water equipment   7000 kcale per hour, air cooling refrigeration
30 Hot water boiler   1000Kg/h, outlet temperature is 90°C
31 Installation system   Stainless steel piping system,power piping system, electric controlling box, electric installation material, installation and commissioning

 UHT milk processing line UHT milk production equipment


The installation and debugging of a milk processing line is a complex and highly professional process, usually involving multiple steps and precautions to ensure the safe, hygienic, and efficient operation of the production line.

The following is the general process and key points:

Preliminary planning: • Demand analysis: Determine product types (such as pasteurized milk, yogurt, UHT milk, etc.), production capacity requirements, factory layout, etc Design drawings: Develop detailed production line layout and equipment configuration drawings based on requirements Equipment procurement: Select processing equipment made of stainless steel materials (such as 304 and 316) that meet food safety standards, including storage tanks, conveying pumps, homogenizers, pasteurizers, cooling systems, filling machines, packaging machines, etc.
On site preparation: • Infrastructure construction: including water and electricity supply, ground leveling, drainage system, air purification system, etc Environmental disinfection: Ensure that the installation area meets the requirements of a sterile or low bacterial environment.
Equipment installation: • Positioning and fixation: Precisely position and fix each equipment according to the design drawings Pipeline connection: Use sanitary grade stainless steel fittings and valves to connect equipment, ensuring that all interfaces are well sealed and avoiding contamination Electrical installation: including wiring of power lines, control panels, sensors, and automation systems, following safety regulations.
Debugging stage: • Single machine debugging: Conduct separate functional tests on each device to check if it operates normally and adjust it to the optimal working state System integration: Integrate individual machines through PLC or higher-level control systems for linkage debugging to ensure accurate data communication.

Cleaning and disinfection: Before the first operation, a comprehensive CIP (in place cleaning) and SIP (in place sterilization) program should be carried out to ensure the hygiene of the production line Trial production: Input a small amount of raw materials for trial operation, inspect the entire process from raw material receiving, processing, filling to packaging, adjust process parameters such as temperature, time, flow rate, etc., until the product quality meets the standard.

Training and Acceptance: • Operator Training: Provide training to production line operators on equipment operation, maintenance, and hygiene management Performance acceptance: Conduct performance testing according to the contract and technical standards to ensure that the production line meets the predetermined production capacity, efficiency, and quality requirements Official certification: Obtain necessary food safety and production licenses, such as ISO, HACCP, etc.

Post maintenance: • Regular maintenance: Establish an equipment maintenance plan, including daily cleaning, regular inspections, replacement of vulnerable parts, etc Troubleshooting: Quickly respond to problems that arise during operation, diagnose and troubleshoot faults. The entire installation and debugging process must strictly comply with food safety regulations and industry standards. If necessary, a professional installation and debugging team can be hired for guidance and implementation.


UHT milk processing line UHT milk production equipment
 
Related machinery of dairy(cheese, butter, milk, yoghurt,cream) processing line
Large outdoor storage tank, agitator tank, jacket tank, ferment growing tank, emulsification tank, milk weighing, milk receiving/collecting, extracting, pasteurizer yoghurt, UHT, HTST pasteurizer, plate pasteurizer, tubular UHT sterilizer, spraying type pasteurization, cooling tunnel, bottle tilting sterilization chain, CIP cleaning system, full-auto CIP, semi-auto CIP, evaporator, curd cutting, whey draining, cheese making, scalding/stretching/molding, cheese vat, mozzarella cheese, cheddar cheese, blending system, pre-pasteurization, cream separator system, powder melting, dissolving system, homogenizer system, turn-key project.
 
 

 
Company Profile

UHT milk processing line UHT milk production equipment

 

UHT milk processing line UHT milk production equipment
 
 
 
UHT milk processing line UHT milk production equipment
 
Our Service
UHT milk processing line UHT milk production equipment
 

 

Trade shows

 

 
UHT milk processing line UHT milk production equipment
 
Certificate

 

UHT milk processing line UHT milk production equipment
 


 

Packaging & Shipping

 

UHT milk processing line UHT milk production equipment

 


 

 

FAQ

 

1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.

 

2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.

 

3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .

 

4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .

 

5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.

 

6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.

 

7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.

 

8) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.

 
 







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now