Concentrated yoghurt processing plants concentrated yoghurt production plant equipment
Summary of Concentrated Yogurt Processing Factory: Concentrated yogurt (also known as thick yogurt or Greek style yogurt) has gradually become one of the popular products in the market due to its high protein content and rich taste. The concentrated yogurt processing factory ensures that the products meet market demand while maintaining high quality through a series of modern production equipment and technologies. The following is a brief overview of the main components and functions of a concentrated yogurt processing factory.
1, Main equipment and functions
1. Raw material processing system
Milk receiving tank: used to receive and store fresh milk, ensuring stable quality of raw materials.
Standardization equipment: Adjust the fat and protein content in milk to meet product standards.
Homogenizer: By high-pressure homogenization treatment, the stability of yogurt is improved and layering is prevented.
2. Preprocessing system
Pasteurization equipment: Pasteurize milk at 72-75 ° C to kill harmful microorganisms and ensure safety and hygiene.
• Cooling system: Quickly cool the sterilized milk to a temperature suitable for inoculating fermentation agents (about 42-45 ° C).
3. Fermentation system
Fermentation tank: provides a suitable environment for fermentation, ensuring the stability and efficiency of the fermentation process.
Intelligent temperature control system: precise control of fermentation temperature to ensure optimal fermentation conditions.
Real time monitoring: Real time monitoring of temperature, acidity, and other parameters during the fermentation process through sensors and automated control systems.
Vaccination equipment: Accurately inoculate lactic acid bacteria and other fermentation agents into milk to ensure smooth fermentation.
4. Concentration system
Ultrafiltration membrane equipment: using ultrafiltration membrane technology to remove some moisture, retain more protein and other solid components, making yogurt thicker.
Centrifugal separator: further removes excess moisture and whey, increasing the concentration and texture of the product.
5. Mixing and blending system
Mixing tank: After fermentation and concentration, mix yogurt evenly with other ingredients (such as fruits, syrup, prebiotics, etc.) to obtain the desired taste and flavor.
• Equipment allocation: Accurately add various auxiliary materials according to the formula requirements to ensure consistent product quality.
6. Filling and sealing system
Aseptic filling machine: Fill the prepared yogurt directly into the final packaging container (such as plastic bottles, paper boxes, etc.) to avoid secondary contamination.
High speed filling: Using advanced filling technology, it can process a large number of packaging containers per minute, improving production efficiency.
Aseptic sealing: Using aseptic sealing technology to ensure the sealing of the packaging and extend the shelf life.
Online testing equipment: During the filling process, the product is inspected for quality using online testing instruments to ensure that each packaging meets the standards.
7. Refrigeration and storage system
• Cold storage: After filling, the yogurt is immediately transferred to the cold storage, with a temperature controlled between 2-8 ° C to maintain its freshness and quality.
Cold chain logistics equipment: Ensure that the quality of yogurt is not affected during transportation and sales.
2, Technical highlights
1. Efficient fermentation technology
Multi strain collaborative fermentation: Introducing the synergistic effect of multiple high-quality strains not only improves fermentation speed, but also produces richer flavor compounds.
Intelligent temperature control: With an advanced temperature control system, the fermentation process is always in optimal condition.
2. Ultrafiltration membrane concentration technology
Efficient concentration: Ultrafiltration membrane technology can remove water while maximizing the retention of protein and other nutrients, making the product thicker and more nutritious.
Low energy consumption: Compared to traditional evaporation concentration methods, ultrafiltration membrane technology has lower energy consumption and more economical operating costs.
3. Full process quality monitoring
Data recording and traceability: From raw material procurement to finished product delivery, all production process data is recorded in real-time in the database to ensure the traceability of each batch of products.
Online detection: Real time monitoring of key indicators (such as acidity, temperature, microbial content, etc.) through online detection instruments to ensure that product quality always meets standards.
4. Environmental protection and energy-saving design
Energy management system: Optimize energy configuration, adopt variable frequency drive, heat recovery and other technologies to reduce energy consumption and improve energy efficiency.
Water resource recycling: Install a water recycling system to treat wastewater from the production process and reuse it in non direct contact areas, saving water resources.
Equipment highlights
Condition: New
Brand name: Shanghai Beyond;
Type: whole processing Line/turnkey project/fruit and vegetables processing/dairy processing/beverage processing
Voltage: 220v/380v
Power(W): 100-200kw
Weight: Different size different weight/customized
Dimension(L*W*H): Different size different dimension/customized
Certification: CE&ISO
Warranty: 12 months/1 year
After-sales Service Provided: Engineers available to service machinery overseas
Main material: SUS304 or SUS316
Control type: automatic, semi-automatic
energy consumption: Low consumption with high efficiency
capacity: 500-10000L/H-customized
installation period: 1-3months
Period time: 30 days-120 days
Cups material: pouches, paper box, glass bottle, pet bottle, glass bottle
Product storage condition: room temperature; low temperature;
The production process of concentrated yogurt (such as Greek yogurt) is relatively complex, but through the application of modern technology, it can ensure efficient, stable, and high-quality production. The following is the main process flow of the concentrated yogurt processing factory:
1, Raw material reception and pretreatment
1. Milk reception
Receive fresh raw milk and conduct preliminary inspections to ensure its quality meets standards.
Store qualified milk in a refrigerated container at around 4 ° C to prevent bacterial growth.
2. Standardization processing
Use standardized equipment to adjust the fat and protein content in milk to achieve the required ratio for concentrated yogurt.
Using a homogenizer to homogenize milk under high pressure, improving the stability of yogurt and preventing layering.
3. Pasteurization
Heat the standardized milk to 72-75 ° C for 15-20 seconds for pasteurization to kill harmful microorganisms.
After pasteurization, quickly cool to 42-45 ° C and prepare to inoculate with fermentation agent.
2, Fermentation process
4. Inoculate fermentation agent
Add lactic acid bacteria and other fermentation agents to the cooled milk to ensure even distribution of bacterial strains.
Transfer the vaccinated milk to a fermentation tank.
5. Fermentation
The fermentation tank provides suitable temperature (42-45 ° C) and environmental conditions to allow lactic acid bacteria to fully ferment.
During the fermentation process, real-time monitoring of temperature, acidity, and other parameters ensures smooth fermentation.
The fermentation time is usually 4-6 hours, depending on the required acidity and flavor.
3, Concentration process
6. Ultrafiltration membrane concentration
After fermentation, pump the yogurt into the ultrafiltration membrane system to remove some moisture and retain more protein and other solid components.
Ultrafiltration membranes can remove moisture while maximizing the retention of nutrients, making the product thicker.
7. Centrifugal separation
After ultrafiltration, the yogurt is further separated by a centrifugal separator to remove excess water and whey, further improving the concentration and texture of the product.
4, Mixing and blending
8. Mixing of ingredients
According to the formula requirements, add other ingredients (such as fruits, syrup, prebiotics, etc.) to the fermented and concentrated yogurt to achieve the desired taste and flavor.
Use a mixing tank to evenly mix all ingredients to ensure consistent product quality.
5, Filling and sealing
9. Aseptic filling
Fill the prepared yogurt directly into the final packaging container (such as plastic bottles, paper boxes, etc.) through a sterile filling machine to avoid secondary contamination.
During the filling process, online testing instruments are used to inspect the quality of the product, ensuring that each packaging meets the standards.
10. Sealing
Use aseptic sealing technology to seal the packaging container, ensuring the sealing of the packaging and extending the shelf life.
The high-speed filling line can process a large number of packaging containers per minute, improving production efficiency.
6, Refrigeration and Storage
11. Refrigeration
After filling, the yogurt is immediately transferred to the refrigerated warehouse, with a temperature controlled between 2-8 ° C to maintain its freshness and quality.
The refrigerated warehouse is equipped with an advanced temperature control system to ensure stable temperature.
12. Cold chain logistics
Ensure that the quality of yogurt is not affected during transportation and sales, using cold chain delivery vehicles to ensure low-temperature storage throughout the entire process.
7, Quality monitoring and traceability
13. Full process quality monitoring
From raw material procurement to finished product delivery, all production process data is recorded in real-time in the database to ensure the traceability of each batch of products.
Real time monitoring of key indicators such as acidity, temperature, microbial content, etc. through online detection instruments to ensure that product quality always meets standards.
14. Data recording and traceability
Each production batch has detailed production records, including raw material sources, processing parameters, quality inspection results, etc., to ensure the traceability of product quality and safety.
Equipment list sample of complete yogurt processing line
Equipment list of complete yogurt processing line (pasteurized milk/yogurt/cheese/cream/butter) |
||
No. | Name | Main technology parameter |
1 | Milk receive, storage and cream separator unit | |
2 | Electron pound scale | Maximum weighing 500KG |
3 | Milk weighing tank | SUS304, single layer, product feeded in through 40 mesh filter net, CIP cleaning ball |
4 | Milk acceptor | SUS304, single layer, CIP cleaning ball |
5 | Milk pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
6 | Twin piping filter | SUS304, two pipe, stainless steal filter element 100 mesh |
7 | Dish separator | Auto residue discharge |
8 | Chiling tank | SUS304, alveolate jacket, attached with compressor |
9 | Milk pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
10 | Preparing unit | |
11 | Blending tank | SUS304, heat insulated, top off center vertical agitator, conical head, airtight manhole, breather valve, digital readout thermometer, anti-eddy baffle, supporters with adjustable feet |
12 | Milk pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
13 | Mini set of plate-type heat exchanger | SUS304, two stages |
14 | High speed emulsification tank | SUS304, heat insulated, bottom high speed emulsifier, digital readout thermometer,s upporters with adjustable feet |
15 | Milk pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
16 | Twin piping filter | SUS304, two pipe, stainless steal filter element 100 mesh |
17 | Sterilizing and homogenizing unit | |
18 | UHT sterilizer | Tub-type, sterilzing temperature 137 C, holding time 4s, full automatic control |
19 | High pressure homogenizer | 40MPa (starting box included) |
20 | Temperature holding | SUS304, holding 300s |
21 | Distributing plate | SUS304, 3 holes |
22 | Cheese/butter processing unit | |
23 | Bufferying tank | SUS304, heat insulated, top off center vertical agitator, conical head, airtight manhole, breather valve, digital readout thermometer, anti-eddy baffle, supporters with adjustable feet |
24 | Milk pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
25 | Cream seperator | |
26 | Bufferying container | SUS304, with cover |
27 | Milk pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
28 | Butter churner | SUS304, stepless timing |
29 | Cheese vat | SUS304, with heating jacket and insising device |
30 | Pressor | SUS304, 6 heads |
31 | Mould | SUS304, 10L, with cover |
32 | Yogurt fermentation unit | |
33 | Fermentation tank | SUS304, heat insulated, top off center vertical agitator, conical head, airtight manhole, breather valve, digital readout thermometer, anti-eddy baffle, supporters with adjustable feet |
34 | Rotary pump | SUS304, hard alloy mechanical seal, manual stepless shift |
35 | Plate cooler | SUS304, single stage, milk discharge at 4C |
36 | Rotary pump | SUS304, hard alloy mechanical seal, manual stepless shift |
37 | Filling unit | |
38 | Higher position tank | SUS304, heat insulated, top off center vertical agitator, conical head, airtight manhole, breather valve, digital readout thermometer, anti-eddy baffle, supporters with adjustable feet |
39 | Pasteurized milk filling machine | |
40 | Yogurt filling machine | |
41 | CIP system unit | |
42 | Semi-auto CIP system | Outer shell of SUS304, inner shell of SUS316, single cleaning way, concentrated acid/alkali tank adding system based on US technology, 100L×2 acid/alkali concentrate tanks |
43 | CIP return pump | SUS304, pump lift 24m, hard alloy mechanical seal, inner shell mirror polished |
44 | Installation part | Whole milk processing line installation and commissioning |
Pre sales services
After-sale service
1. Equipment warranty period: We provide a one-year free warranty service for mechanical equipment. If any non-human caused problems occur during the warranty period, we will provide free repair or replacement services.
2. Maintenance and upkeep services: We provide regular or irregular equipment maintenance and upkeep services to ensure the normal operation of the equipment. We will provide 24-hour online technical support services.
3. Accessory supply: We guarantee to provide original factory accessories in a timely manner in case of equipment damage or replacement of parts.
4. Training services: In order to enable customers to effectively operate and maintain equipment, we will provide equipment operation and maintenance training.
5. Installation and debugging: We will provide equipment installation and debugging services to ensure that the equipment is installed correctly and can operate normally.
1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.
2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.
3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .
4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .
5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.
6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.
7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.
8) Q: Do you give any Discount?