Customization: | Available |
---|---|
After-sales Service: | One year |
Warranty: | 1 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Raw material
|
Fresh tomato(about 4.5brix)
|
End product
|
Tomato paste (28~30brix)
|
Processing capacity
|
6 tons per hour based on fresh tomato
|
Daily Output
|
17~20 tons per day(24hours)
|
Packaging
|
Aspect drum(5~220L)
|
Total power
|
220KW
|
Steam Consumption
|
3.5-4.2 t/h
|
Water Consumption
|
15-20 t/h
|
Cooling circulating water consumption |
180-250 t/h( inlet temperature: 32ºC;outlet temperature:38ºC) |
The customized Strawberry processing equipment is a complex but orderly process that involves multiple stages, from initial requirement analysis to final installation, debugging, and after-sales service. The following is the general process of a customized tomato sauce production line:
1. Requirement analysis and communication
• Customer demand collection: Detailed understanding of customers' specific needs, including production line capacity, product types (such as different flavors of tomato sauce), packaging forms (such as bottled, canned), budget constraints, etc.
On site inspection: If possible, arrange for engineers to conduct on-site inspections at the customer's production site to evaluate the existing facility conditions and spatial layout.
Preliminary scheme design: Based on the collected information, design a preliminary technical scheme, including equipment configuration, production line layout, process flow, etc.
2. Confirmation of technical solutions
Technical exchange meeting: Hold a technical exchange meeting with clients to explain the preliminary design plan in detail and listen to their feedback.
• Plan adjustment: Make necessary modifications and improvements to the plan based on customer feedback to ensure that the final plan meets all customer needs.
• Cost estimation: Provide a detailed cost budget report, including equipment costs, installation and commissioning costs, transportation costs, etc.
3. Contract signing
Business negotiation: Negotiate and reach a consensus on commercial terms such as price, payment method, and delivery time.
Signing the contract: After both parties reach a consensus on all details, the sales contract and technical agreement are officially signed.
4. Detailed design and manufacturing
• Deepening design: Based on the technical specifications in the contract, complete detailed engineering drawings and technical documents.
• Procurement of raw materials and components: Start purchasing the required raw materials and standard parts according to the design drawings, and prepare for the processing of self-made parts.
Equipment manufacturing: Assemble and test equipment according to established quality standards to ensure that each device meets design requirements.
5. Installation and commissioning
Pre acceptance before shipment: Invite customers to the factory for pre acceptance to check whether the equipment meets the technical specifications specified in the contract.
On site installation: Transport the equipment to the customer's factory and begin installation work, strictly following the construction plan during the process.
System debugging: Conduct comprehensive system debugging after installation to ensure the stable operation of the entire production line.
• Operation training: Provide necessary training for customers' operators, teaching them how to correctly use and maintain equipment.
6. After sales service
• Warranty service: Provide free repair services within a certain period of time to solve various possible problems.
• Regular Follow up: Regularly send people to visit customers to understand the actual usage of equipment and collect improvement suggestions.
• Spare parts supply: Ensure a long-term stable supply channel for spare parts, so that customers can use them in the future when replacing vulnerable parts or upgrading equipment.
Specific technical points
1. Raw material processing:
Cleaning equipment: Choose efficient cleaning equipment to ensure that the tomato surface is clean and free of impurities.
• Crushing and pulping equipment: Select suitable crushers and pulping machines to improve the utilization rate of raw materials.
2. Concentration and seasoning:
Evaporator: Choose a suitable evaporator to ensure efficient concentration while saving energy and reducing consumption.
Seasoning system: Design a flexible seasoning system to facilitate adjustments according to different product formulas.
3. Sterilization and filling:
Sterilization equipment: Advanced high-temperature instantaneous sterilization equipment is used to ensure food safety.
Filling and sealing equipment: Choose high-precision filling and sealing machines to ensure packaging quality.
4. Automation control:
PLC control system: Adopting advanced PLC control system to achieve automation control of the entire production line.
Sensors: Install various sensors to monitor real-time parameters such as temperature, pressure, and flow rate, ensuring the stability and consistency of the production process.
Pre sales services
After-sale service
1. Equipment warranty period: We provide a one-year free warranty service for mechanical equipment. If any non-human caused problems occur during the warranty period, we will provide free repair or replacement services.
2. Maintenance and upkeep services: We provide regular or irregular equipment maintenance and upkeep services to ensure the normal operation of the equipment. We will provide 24-hour online technical support services.
3. Accessory supply: We guarantee to provide original factory accessories in a timely manner in case of equipment damage or replacement of parts.
4. Training services: In order to enable customers to effectively operate and maintain equipment, we will provide equipment operation and maintenance training.
5. Installation and debugging: We will provide equipment installation and debugging services to ensure that the equipment is installed correctly and can operate normally.
1 ) Q: How can we visit your factory?
A: If you come from abroad, air to shanghai airport, then we can pick you up at airport.
2) Q: How do you ensure the quality of your products?
A: Our Company is a state owned enterprise with more than 16 years experience , strict operation policy is performed, advanced processing machines guarangtee the precision of all components, workers with operation license, parts get multiprocessing, transmission& electrical parts are of international famous brand. Series of test and inspection are done in the whole producing state.
3) Q: What payment methods your company accept?
A: We accept most of the payment methods , but mainly accept T/T, L/C at sight .
4) Q: How long is the warranty time for your products?
A: Our officially promised warranty time is 12 months after commissioning .
5) Q: I am new in this field,can you supply us turnkey services?
A: YES.We can supply all the system including Market Analysis/Product Analysis/Location Choice/Processing Flow Design/Equipment Layout Design/Building Design direction/Equipment mode selection/Equipment Manufacturing/Equipment Mounting/Equipment Debugging/Worker Training.
6) Q: What ' s the shipment terms and delivery time of your company?
A: Well, the delivery time depend on the quantity of your order. Usually is 20 days . For some customized machine 30 days is necessary.
7) Q: Can you supply OEM services?
A: Yes,we have our R&D team,and we have more than 400 workers with workshop area 75000 square meters.
8) Q: Do you give any Discount?
A: I will surely try my best to help you get those by the best price and good service at the same time.